3、封鎖底漆恰當(dāng)加水進(jìn)步膩?zhàn)痈街Γ汉芏囗?xiàng)目在施工時(shí),底漆開桶后直接運(yùn)用,這樣會(huì)影響底漆的浸透性;合理的做法是,封鎖底漆恰當(dāng)加水稀釋,讓底漆可以浸透到膩?zhàn)踊鶎永锩妫瑥亩M(jìn)步外墻膩?zhàn)痈街Α?/div>
3. Blockade primer properly watered to improve putty adhesion: many projects in the construction, primer barrel directly after use, which will affect the permeability of primer; a reasonable approach is to block primer properly watered dilution, so that primer can be soaked into the base of putty, thereby improving the adhesion of external wall putty.
4、底漆施工時(shí)避開陽(yáng)光直射墻面能夠改善膩?zhàn)痈街Γ禾貏e是在夏天,陽(yáng)光直射的墻面溫度十分高,底漆滾涂后很快成膜,不可以浸透到外墻基層里,就會(huì)形成附著力差,相反,避開陽(yáng)光直射的墻面,底漆恰當(dāng)多加水,讓底漆充沛浸透到膩?zhàn)踊鶎永?,?huì)進(jìn)步膩?zhàn)痈街?/div>
4. Avoiding direct sunshine during primer construction can improve the adhesion of putty: Especially in summer, the temperature of direct sunshine wall is very high, primer film is formed quickly after rolling, and can not be soaked into the outer wall base, which will result in poor adhesion. On the contrary, avoiding direct sunshine wall, primer should be properly watered, so that primer can be fully soaked into the base of putty, which will improve the adhesion of putty. With.
More about putty powder, Xiaobian will continue to update for you, please continue to pay attention to us: http://www.chnzylw.com/